Illustrative image – not actual.The Delhi-Noida toll bridge is expected to be commissioned by February 2001, three months ahead of schedule.
The bridge is being constructed by
the Noida Toll Bridge Company, a special purpose vehicle promoted by Infrastructure
Leasing and Financial Services.
The bridge, being constructed at a
cost of Rs.408 crore, will connect sector 15/16 of Noida to south-east Delhi
and will have an average design speed of 80 kmph. The bridge includes a 552.5
metre long bridge over the river Yamuna, three minor bridges, a 300 metre long
toll plaza and a flyover at Ashram crossing.
The bridge is expected to significantly
reduce travel time between Delhi and Noida and also result in lower vehicle
operating costs. The toll rates have been tentatively fixed at Rs.5 for
two-wheelers, Rs.15 for cars, Rs.25 for light commercial vehicles and Rs.30-40
for buses and heavy commercial vehicles.
