Delays in Orissa Waste Management System project        Illustrative image – not actual.

The proposal for setting up an Integrated Municipal Solid Waste Management (IMSWM) system for Greater Sambalpur area in Orissa is facing hurdles.

 

The project has not yet materialised as the civic body has sought RfQ-cum-RfP on 6 August 2013, for the project, for Greater Sambalpur area consisting of Sambalpur Municipality, Burla NAC and Hirakud NAC by 20 September 2013, which has received no response till date.

 

The Waste Management System project will be developed on PPP mode by the Sambalpur Municipality on DBFOT basis with a concession period of 20 years.

 

The scope of the project includes door-to-door collection of solid waste from households and commercial centres, transportation to secondary collection points, transportation to the landfill site, development of processing plant and sanitary landfill at Jamadarpali, besides ensuring provisions laid down in the Municipal Solid Waste (Management and Handling) Rules of 2000.

 

Besides, efforts are being made by Sambalpur Municipality to implement the project as early as possible and soon a fresh proposal of RfQ-cum-RfP will be sought again for the same.

 

Related Link:
Project profile

← All latest storiesBack to top →