Illustrative image – not actual.DEE Development Engineers has secured contracts aggregating Rs 206.55 crore (excluding GST) through a letter of intent (LoI) for the manufacturing and supply of critical piping assemblies.
The order has been awarded by a public sector Maharatna EPC firm in power sector, reinforcing the company’s strong presence in India’s industrial and power engineering sector. The scope of work involves the design, manufacturing, and supply of high-performance piping systems, including the main steam package and hot reheat system essential for thermal power plant operations. These components play a crucial role in ensuring efficient steam flow and heat management within large-scale power generation units, directly impacting operational efficiency and reliability. For two units, the completion period is set between six to 12 months from the date of purchase order, while the remaining two units are scheduled for execution within 2 to 15 months from PO issuance.
The contract highlights DEE Development Engineers’ growing footprint in the energy infrastructure space and strengthens its order book visibility in the thermal power engineering segment, supporting future revenue execution.
