Illustrative image – not actual.The Goregaon-Mulund Link Road project has received a major boost with the acquisition of the Saki Vihar Road in Powai.
Brihanmumbai Municipal Corporation (BMC) has completed the paperwork to take over the Saki Vihar Road in Powai, which is presently being maintained by the Dairy Development Board.
BMC has also appointed two consultancy firms -- Technogems and Pentacle -- to prepare a project report for the proposed 9.2 km Link road. BMC had called for a request for proposal (RfP) to appoint a project consultant in 2013.
The project cost will be finalised only after the project reports have been submitted. The project is proposed to be completed in 2015.
The Goregaon-Mulund Link Road project includes stilt road work, like the ones on coastal roads. It will also pass through the Sanjay Gandhi National Park, and through marshy land. Hence a geo-technical survey to check the nature of the soil is needed.
