DDA gives nod for development of 20 metro stationsIllustrative image – not actual.
The planning body of the DDA has given its approval for the development of 20 metro stations and their surrounding areas under the multi-modal integration (MMI) project.

The approval was given by Unified Traffic and Transportation Infrastructure (Planning & Engineering) Centre (UTTIPEC).

The DDA's planning body also gave the nod to various other road infrastructure projects in Delhi.

The MMI projects comprise an integrated scheme for pedestrian facilities like e-rickshaws, foot overbridge and underpasses, and space for parking of auto rickshaws. It also includes a provision for non-motorised vehicles to solve problems exiting around the metro stations.

The Master Plan for Delhi has proposed Urban Extension Road-II (UER) which links NH-1, 10 and 8, aimed at reducing traffic from the existing Ring road and Outer Ring road.

Approval has been granted to a part of the road alignment between Kanjhawala and NH-10, (Rohatk road). DDA has also approved an under bridge at Holambi Kalan and tunnel road at Meer Vihar, Bhagya Vihar, as part of this road. This new road is provided with a BRT and MRTS system.

The nod was also given to an upgradation proposal of the existing Bund Road along the Canal connecting Bijwasan-Najafgarh Road to the Northern Peripheral Road, to enable local traffic flow in between Delhi and Gurgaon, in the first phase.

In addition, DDA approved the Road Improvement Plan for the Mangal Pandey Marg in east Delhi, from foot of the Signature Bridge to Bhopura, the Delhi UP border.

← All latest storiesBack to top →