Illustrative image – not actual.Dilip Buildcon (DBL) has received letter of award (LoA) by the National Highways Authority of India (NHAI) for hybrid annuity project in Madhya Pradesh.
The scope of work involves construction of road tunnel, viaduct and Churhat Bypass of Rewa Sidhi section of NH-75E from chainage 33.200 to chainage 55.400 (design length 15.350 km) as cement concrete pavement configuration in Madhya Pradesh on design, build, operate and transfer (DBOT) or hybrid annuity basis.
DBL quoted a bid project cost of Rs 1,004 crore. The 15.35 km long project has a construction period of 48 months and an operation period of 15 years from the date of commencement.
