DBL emerges L1 bidder for Bhopal Metro rail project Phase-IIllustrative image – not actual.

Dilip Buildcon (DBL) has emerged as the lowest (L1) bidder for Bhopal Metro project Phase-I by the Urban Administration and Development Department Madhya Pradesh Metro Rail Company.

The scope of work envisages design and construction of elevated viaduct of length 6.225 km between AIIMS and Subash Nagar (excluding stations) including entry and exit to Depot for Bhopal Metro Rail Project Phase-I.

The value of the proposed rail project is Rs 247.06 crore. The project has a total length of 6.225 km and a construction period of 24 months.

← All latest storiesBack to top →