DBL bags OB removal contract mining work for Nigahi ProjectIllustrative image – not actual.
Dilip Buildcon (DBL) has bagged OB removal contract mining work for Nigahi Project at Singrauli district in Madhya Pradesh worth Rs 2,122.74 crore (including GST).

The company has secured the contract by the Northern Coalfields (NCL), a subsidiary of Coal India (CIL) and issued letter of award (LoA) vide letter dated 18 November 2019.

The scope of work includes excavation of overburden of first dig (solid) by mechanical means such as excavators, dumpers/ tippers, drills, dozers, graders and water sprinklers for composite work consisting of blast hole drilling, excavation, loading, transportation of broken rock/ soil/ earth, unloading/ dumping, spreading, dozing, water sprinkling and grading, etc as per instructions of engineer-in-charge at specified places at Nigahi OCP of NCL at Singrauli district.

The contract period is for 1,552 days.

← All latest storiesBack to top →