Illustrative image – not actual.The Kandla Port Trust has signed an MoU with the Central Warehousing Corporation (CWC) for developing and operating a container freight station (CFS). The CFS is estimated to cost Rs.22 crore.
KPT has handed over 14 hectares of land located behind
the container terminal, outside the custom-bonded area, to CWC for undertaking
the first phase of the CFS. This phase would be capable of accommodating 5,000
twenty-foot equivalent units (TEUs) and is expected to be completed by February
2004.
In the second phase of the project, the capacity of
the CFS would be increased to 8,000 TEUs.
The CWC is offering 36 per cent of IMPEX trade as
minimum guaranteed throughput of CFS.
The development of CFS is expected to boost the
container traffic throughput of the port.
