Ogden Energy Group (OEG) of USA, the lead promoter of the Bakreswar project in West Bengal, has appointed Crisil to study the viability of the second stage of the project, which is estimated to cost Rs.1,621 crore. This comes at a time when the West Bengal state government is set to launch the first stage of the 630 MW project on 28 September 2000.

 

OEG invests in the project through its arm, Odgen Energy Asia-Pacific in Hong Kong.

 

Under the study, Crisil would look into the long-term financial viability of the project, besides the power demand scenario in state. The study would also involve the evaluation of the West Bengal State Electricity Board (WBSEB) and the West Bengal Power Development Corporation (WBPDCL). This is because the entire power generated from the project would be bought by WBPDCL, which in turn would sell it to WBSEB.

 

However, the financials of both WBSEB and WBPDCL do not paint a good picture. WBSEB, which is a cash strapped entity, owes WBPDCL a sum of Rs.1,200 crore.

 

← All latest storiesBack to top →