Consultant selected for Versova-Bandra sea linkIllustrative image – not actual.

The MSRDC has appointed Parsons Brinckerhoff Consulting, a Germany based consultancy firm, for a detailed feasibility study of the Versova-Bandra sea link project.

The company will prepare detailed feasibility report along with a geo- technical study for the project in the next six months.

MSRDC is likely to float bids for the Rs 3,000 crore project by June 2011. The Versova-Bandra sea link with a stretch of about 10.1 km is a part of the Western Freeway sea link project, from Versova to Nariman Point.

Related Links:
Project profile

← All latest storiesBack to top →