Illustrative image – not actual.Tamil Nadu Urban Infrastructure Financial Services has appointed Wilbur Smith Associates to prepare a feasibility report for the four circular bus corridors in Chennai along with the DPR primarily of the Bus Rapid Transport System, which starts from Adyar and extends up to Porur through Ramavaram.
However, the plan to begin the corridor from the proposed highway connecting Srinivasapuram at Foreshore Estate to East Coast Road remains. The alignment of the first leg of this stretch will be decided when the consultants submit the feasibility report in February 2009 and the DPR is expected to be submitted in April 2009.
It was earlier proposed to build a dedicated bus corridor on both sides of the river up to Ramapuram, and, from there on, an elevated corridor up to Porur. The stretch from Adyar to Porur is 11.5 km, and is estimated to cost Rs.40 crore a km.
