Illustrative image – not actual.Civil construction, dredging and land fill work on Dhamra Port Co's port project in Bhadrak district of Orissa has commenced.
The first phase of the port project comprises a 700m deep berth (with 18m draft to handle two super cape size vessels), a 18km channel of depth ranging from 17.5-18.5m and a 62km rail link between Bhadrak and Dhamra. Work on Phase I project is scheduled for completion by 2010 and will only handle dry bulk cargo.
When fully completed, the port will have 13 berths and will handle all types of cargoes.
Also See:
Dhamra Port to secure foreign loans for dredging (25-Jul-07)
