Illustrative image – not actual.The construction of Asiko LPG and LNG Terminal has begun following a groundbreaking ceremony carried out at Ijora, Lagos, by the project developer, Asiko Power.
With a full containment LNG storage tank and 5,000 tonne of LPG and propane storage, upon completion, the Asiko LPG and LNG Terminal is expected to be the first dual liquefied gas terminal in Nigeria, and the first land-based LNG receiving terminal in Africa.
It will be able to receive, store and distribute LPG, propane, butane, and LNG, and it will also make LPG, which is a much cleaner domestic fuel than many that are currently in use, more easily accessible in Nigeria.
India’s OPTECH Engineering is the projects EPC contractor, while ILF Engineers Nigeria is the project management company (PMC).
With a full containment LNG storage tank and 5,000 tonne of LPG and propane storage, upon completion, the Asiko LPG and LNG Terminal is expected to be the first dual liquefied gas terminal in Nigeria, and the first land-based LNG receiving terminal in Africa.
It will be able to receive, store and distribute LPG, propane, butane, and LNG, and it will also make LPG, which is a much cleaner domestic fuel than many that are currently in use, more easily accessible in Nigeria.
India’s OPTECH Engineering is the projects EPC contractor, while ILF Engineers Nigeria is the project management company (PMC).
