MSRDC will set up retail, wholesale and industrial activities in 71 villages along the e-way. It has proposed to increase the area for each of the category and balance development along with proposing a Metro corridor and Bus Rapid Transportation System (BRTS) in the area the where commercial activity will be located.
The MSRDC also plans to have the same connected to the proposed Virar-Alibaug Multimodal Corridor by constructing a road and Metro. As per the Development Plan (DP) of MSRDC, around 41 percent will be residential area, CBD will be around 1.36 percent, followed by 1.50 percent for theme-based zone, 1.92 percent for logistics park zone.
The industrial zone will have 19.58 percent reservation and transportation reservation at 17.20 percent. It has also proposed 5.24 percent of the total 95 sq km area for recreational purpose.
Apart from the commercial uses permitted, the zone will also host smart Fintech centres as per the Maharashtra Fin Tech Policy 2018, which promotes start-ups, incubators, accelerators along with financial services. IT Parks, IT SEZs, financial services will also be permissible for the same.
