Illustrative image – not actual.The Cochin International Airport (CIAL) has reopened its renovated Terminal-1 on 13 December 2018.
The terminal, renovated at a cost of Rs 240 crore, is a mix of traditional architecture with modern airport facilities, and was inaugurated by Chief Minister of Kerala Pinarayi Vijayan on 12 December 2018. It will house 2,600 cars.
CM also inaugurated the enhancement of the solar power production capacity to 40 MW at CIAL. CIAL has redesigned Terminal-1 on Kerala heritage lines, and the work was completed in 18 months.
With the commissioning of the new solar carport for Terminal-1, the total installed capacity of the carports will be 5.1 MW.
The government is prepared to form a special purpose vehicle (SPV) on Cochin International Airport (CIAL) model to take over the Thiruvananthapuram airport and manage its operations.
