Illustrative image – not actual.The Commission of Metro Rail Safety (CMRS) has initiated the final safety inspection of the extended section of Indore Metro, a significant step towards its public launch.
A six-member team led by CMRS Commissioner Nilabhra Sengupta started the evaluation on March 15, focusing on the 11.5 km stretch between Super Corridor Station No. 2 and Radisson Square. This section is part of a broader 17.5 km extension. During the inspection, the team is thoroughly assessing the Metro’s safety systems and infrastructure readiness. The trial runs will involve testing metro trains at speeds of up to 80 km/h, focusing on braking performance and emergency response capabilities. Key operational components under review include viaduct tracks, signalling systems, electrical infrastructure, and rolling stock.
The inspection marks a crucial step in the process before the extended metro corridor can be opened for the public, enhancing the city’s public transportation network.
