CM Stalin lays foundation for 13.5 km elevated corridor on East Coast RoadIllustrative image – not actual.

Chief Minister MK Stalin laid the foundation stone on 26 February, 2026 for a 13.5 km long, four-lane elevated corridor from Thiruvanmiyur to Uthandi on East Coast Road (ECR), at an estimated cost of Rs 2,100 crore.

The project, expected to take three years to complete, aims to ease the heavy traffic congestion on ECR, which witnesses around 70,000 vehicles a day. Despite widening the road to six lanes, traffic flow remains slow due to vehicles from residential areas merging onto the highway. The elevated corridor will help avoid waiting at traffic signals from 130 side roads, enhancing mobility along this stretch. The facility will feature ramps at key junctions including West Avenue, Neelankarai, and Uthandi, with additional ramps at LB Road and the RTO junction.

The project will be carried out on a hybrid annuity model (HAM), combining EPC and BOT models. Local residents have welcomed the initiative, hoping it will improve pedestrian access and streamline traffic near the Marundeeswarar Temple.

← All latest storiesBack to top →