Illustrative image – not actual.The Chief minister of Gujarat, Anandiben Patel, laid the foundation stone for the Rs 16.42 crore embankment project on 28 October, 2014. This will safeguard Surat from the recurring flash floods in the Tapi river during the monsoons.
The embankment length is approximately 2,970 mtr and stretches from Nehru Bridge towards Pal. This can protect the residents of Adajan and Pal from floods even if around six lakh cu of water is released from Ukai dam. During the monsoon season, around two and half lakh or three lakh cu of water is released in these regions from Ukai dam.
The state government sanctioned Rs 174 crore to increase the height of the embankments between Nehru Bridge to Kathod, after the devastating flood in 2006. This can lead to withstanding an inflow of eight and a half lakh cu of water released from Ukai.
The Gujarat Chief Minister also inaugurated the taluka Seva Sadan in Olpad, constructed at a cost of Rs 12 crore; laid the foundation stone for the Gothan railway overbridge (ROB) to be built at a cost of Rs 135 crore; and inaugurated a sugar cooperative mill at Saras village run by the Kantha Vibhag Khand Sahkari Mandali.
