Illustrative image – not actual.The Punjab Cabinet, on 12 December 2012, approved Chandigarh-Mohali metro rail project.
The project which will link the city with its satellite town Mohali is estimated to cost Rs 1,427 crore. The total length of the metro rail covering Chandigarh, Panchkula and Mohali is 37.57 km, and will be developed at a cost of Rs 10,900 crore.
First corridor will be developed from Capital Complex Chandigarh to Gurdwara Singh Shaheedan Sector 70 in Mohali having a length of 12.49 km, of which 3.97 Km in Mohali city. The second corridor will be from Mullanpur (Punjab portion) to Grain Market Panchkula (Haryana) having a length of 25.07 km, of which 3.87 km will be in Mullanpur.
