Centre proposes Rs 2,183-cr River Basin Management Scheme for 2026–31Illustrative image – not actual.

The Centre has proposed to continue the River Basin Management (RBM) scheme during the 16th Finance Commission period from 2026–27 to 2030–31 with a fully funded outlay of Rs 2,183 crore, according to the Ministry of Jal Shakti.

The proposal builds on the earlier phase of the scheme implemented from 2021–22 to 2025–26, which had an allocation of Rs 1,276 crore, reflecting an increased focus on integrated water resource development and planning at the basin level. The scheme aims to promote sustainable and efficient use of water resources while supporting irrigation expansion, hydropower generation, and flood management across India’s major river systems. It places special emphasis on strategically important and water-rich but underdeveloped regions, particularly in the North East and the Indus basin covering Jammu & Kashmir and Ladakh, including river systems such as the Brahmaputra, Barak, and Teesta.

The scheme includes basin-level master planning, flood control, erosion management, interlinking studies, and preparation of detailed project reports to enhance long-term water security and infrastructure resilience. It is being implemented through agencies such as the Brahmaputra Board, Central Water Commission, and National Water Development Agency.

← All latest storiesBack to top →