Illustrative image – not actual.India currently has nearly 25,000 MW of operational gas-based capacity, all of which is stressed because of gas unavailability. The scheme, being discussed at the level of cabinet secretary-led high-level empowered committee, is proposed to be operated for the next two financial years.
The proposal envisages price pooling of 5.45 mmscmd of ONGC deep water gas, currently with GAIL, with imported LNG and supplying it to power plants. There are two options of allocation being mulled at this stage, which could be auction of the gas or allocation by rotation to power projects.
