Illustrative image – not actual.
The Central Railway has issued tender for dismantling Lokgram foot-over-bridge (FOB) to commence new skywalk work on the same place.
The Smart Kalyan Dombivli Corporation (SKDCL) will develop the new FOB once the dismantling work is completed. The Railways had closed the 313 mtr long Lokgram FOB connecting Kalyan station in May 2019 after it was declared unsafe.
For the 50,000 residents of Lokgram, Lokvatika, Lokdhara, and Haji Malang, Lokgram FOB was direct way to the station as well as to the west side.
The Central Railway has asked KDMC to pay Rs 1.32 crore for the new bridge's design so that work can be started after dismantling.
The construction of the new bridge is expected to cost Rs 70 crore. Of the total amount, Rs 40 crore has been sanctioned by KDMC while the remaining amount of Rs 30 crore will be sanctioned from SKDCL.
