Illustrative image – not actual.The Union government has reportedly approved three new national waterways aggregating 1,858 km. This would be in addition to the existing three national waterways that span over 2,700 km.
The new waterways would come up across the Kakinada-Pondicherry canal integrated with the Godavari and Krishna rivers, the Barak river and the East Coast canal integrated with the Brahmani river. The first of these proposed national waterways passes through Andhra Pradesh and Tamil Nadu, the second is entirely in Assam but is connected with Haldia and Kolkata ports through the waterways in Bangladesh, and the third is in Orissa and West Bengal.
Development work is to begin in 2006 and the three new waterways would be commissioned by March 2007.
At present the national waterway network includes the Ganga between Allahabad and Haldia (NW 1- 1,620 km), the Sadiya-Dhubri stretch of river Brahmputra (NW 2- 891 km) and the Kollam-Kottapuram stretch of the West Coast canal along with the Champakara and the Udyogmandal canals (NW 3- 205 km). Fixed schedule sailings have begun on NW 1.
An outlay of Rs.636.73 crore has been provided for inland water transport infrastructure development in the Tenth Plan - a massive jump from the Rs.150 crore allocated in the Ninth Plan.
