CCEA nod to channel deepening at Tuticorin portIllustrative image – not actual.

The CCEA gave its approval for deepening the channel and basin at Tuticorin Port.

The project scope includes dredging the channel to a depth upto (-) 14.70 m below chart datum and to a width of 230 m and to a length of 3.40 km from the port entrance. The approval also includes dredging a part of the existing harbour basin area including the turning circle to a depth upto (-) 14.10 m below chart datum.

The estimated cost of the project is Rs.538 crore, of which Rs.349.70 crore will be borne by Tuticorin Port and Rs.188.30 crore will be provided by the Centre as grant. After completion, Turicorin port will handle fourth generation container vessels of 56,000 DWT (3,000-4,000 teu's) with loa of 290m; beam of 32.50m, bulk carrier upto 75,000 DWT with maximum draught of 12.80 m and it will help in reducing the sea freight for bulk cargo.