CCEA clearance for road, railway projectsIllustrative image – not actual.

The Cabinet Committee on Economic Affairs (CCEA) has cleared a roadway project in West Bengal which is assisted by the Asian Development Bank (ADB). Two railway projects have also received CCEA approval.

 

The CCEA approved the development of Barasat-Raigunj (NH-34) highway project with an investment of Rs.1,085.7 crore. ADB would providing funds to the tune of Rs.698.89 crore, another Rs.57.81 crore would be provided by the Centre while the West Bengal government would provide the balance Rs.57.81 crore. 

 

The construction of the 50.23 km broad gauge railway line between Tanur and Guruvayur in Kerala, at a cost of Rs.137.71 crore was also approved. The railway line would provide vital transportation link along the coastline from Edapally to Tanur/ Kuttiapuram through the famous pilgrimage Guruvayur.

 

The third project cleared by CCEA involves the gauge conversion (GC) of the 115.76 km Sri Ganganagar-Sarupsar Canal loop railway line in Rajasthan from metre gauge to broad gauge.  The GC work, estimated to cost Rs.112.28 crore, would provide an alternate route between Bhatinda and Suratgarh, besides facilitating the development of the hinterland around Jodhpur and Jaisalmer. The project is to be completed within 5 years.

← All latest storiesBack to top →