Illustrative image – not actual.The Cabinet Committee on Economic Affairs (CCEA), on 22 September 2005, approved the Numaligarh-Siliguri product pipeline project to be developed by Oil India Ltd.
The pipeline will evacuate petroleum products from Numaligarh Refinery Ltd's (NRL) 3 million tpa petroleum refinery in Assam for distribution in the Siliguri consumption centres in West Bengal. The pipeline will help the refinery to operate at full capacity.
Oil India Ltd already has a 259-km product pipeline from Numaligarh to Guwahati (in Assam). The current project involves construction of a 201-km loop from Guwahati to Siliguri in West Bengal. The project costing Rs.468.92 crore is scheduled for completion within two years.
The Numaligarh-Siliguri pipeline, when fully complete, will transport 1.72 million tonnes of petroleum products (kerosene, petrol and diesel). It will also help in Numaligarh refinery operating at full capacity of 3 million tpa as against 2.2 million tpa, at present.
Background: Numaligarh Refinery Ltd, a subsidiary of Bharat Petroleum Corporation, operates a 3 million tpa petroleum refinery at Numaligarh. Oil India Ltd, a national oil and gas company, is engaged in exploration and production of oil (and gas), production of LPG and transportation of crude and petroleum products. It operates largely in India's North-Eastern region. In 2004-05, OIL produced 3.196 million tonnes of crude oil, 2 billion cu.m. of natural gas and 49,500 tonnes of LPG. For 2006-07, OIL has targeted crude production of 4 million tonnes.
