Illustrative image – not actual.The Rs 784 crore Cauvery joint drinking water project will be completed by the end of this summer.
The project aims to fulfill the drinking water needs of three municipalities, six town panchayats and eight panchayat unions in Madurai district and one town panchayat in Sivaganga district.
The state government had decided to harness water from Cauvery river since Vaigai river dries out during the summer.
As per the joint drinking water scheme, three wells were created on Cauvery riverbed at Mettu Mahadhanapuram near Kurithalai in Karur district. Around 36.55 lakh ltr of water will be drawn using high power pumps from these wells and stored in sumps. From there, water will be pumped into another sump of the same capacity at Kottaiyur, using pipes extending over a length of 100.73 km. From this point, water will be pumped to 332 smaller sumps and 1,590 overhead tanks (out of which 78 are under construction) with the help of a 268.96 km major pipeline and a network of 2154.26 km pipelines.
Another 71.59 km pipeline will be added to the existing distribution pipelines extended over 2468.07 km.
The project is expected to benefit 12.42 lakh people at present, 13.94 lakh people by 2027 and 15.92 lakh people (the maximum capacity of the project) by the year 2042. By 2042, there are plans to distribute as much as 84 million ltr per day (MLD).
