Cantilever to come up over Ernakulam JunctionIllustrative image – not actual.

Kochi Metro trains will travel through a 90 metre long balanced cantilever concrete span that will come up diagonally over railway lines at Ernakulam Junction railway station by 2017 end.

The structure would connect the metro viaduct from near the main entry of the station and Karshaka Road located near South Overbridge’s underpass. The stretch is part of metro’s phase 1-B extending between Maharaja’s College Ground and Pettah which will be constructed by S P Singla Constructions.

← All latest storiesBack to top →