Cairn India and ONGC have likely to finalise soon their plans to jointly develop the Ambe and North Tapti offshore marginal gas fields in the Gujarat coast.

The Cairn-operated joint venture has pegged the estimated cost of developing Ambe at approximately Rs.300 crore. ONGC is likely to pump in around Rs.500-600 crore for development of North Tapti. ONGC proposes to build two platforms in North Tapti for production of 2-2.2 mmscmd gas and associated oil, which will be connected to Cairn's existing pipeline network for processing at Hazira.

The project will lead to natural gas production of 1.5 mmscmd from Cairn operated Ambe field and 2 mmscmd by ONGC's North Tapti.

Also See:
Cairn India to invest Rs.8,400 crore in oilfields, pipeline project

← All latest storiesBack to top →