Illustrative image – not actual.Cairn Energy India Pty Ltd has
invited pre-qualification bids for front-end engineering and design study for
the development of the Annapurna gas field in the KG-DWN-98/2 offshore block on
the east coast of India.
The field water depth ranges from
800 to 1200 metres and is located 40 km offshore. The field is covered by 3D
seismic and one well has been drilled and tested. A further appraisal well is in
the drilling programme for August/September 2001. Subject to the results of the
appraisal well, Cairn plans to enter into a contract in early October 2001 to
undertake a phased development programme, which will identify the optimum
development plan and its cost.
The contract deliverables would
be:
Phase 1 Q4 2001
Initial study to identify the optimum
development plan, the phasing and its cost to a level of +/- 15%. The duration
of this study is likely to be 120 days.
Phase 2 Q1 & Q2 2002
Detailed development study that will
be the basis for the Field Development Plan and will provide the scope of work
for the preparation of tender documentation.
Phase 3 Q3 & Q4 2002
Preparation of tender packages and evaluation of tenders in anticipation of receiving project sanction by end-2002.
Initiation of phases 2 & 3 would be subject to the findings of phase 1 and would be at the option of Cairn.
Companies wishing to
pre-qualify are required to submit bids by 24 August 2001.
Pre-qualification documents may be submitted to:
Principal Contracts Coordinator – East
Cairn Energy India Pty Ltd
Wellington Plaza, 2nd floor,
90 Anna Salai,
Chennai 600 002
India.
Ph: 91 44 855 5300
Fax: 91 44 855 5310