Cairn Energy India Ltd (CEIL) has invited EoIs from potential engineering consultants for Bhagyam and Aishwariya oil field development and Mangala Processing Terminal (MPT) capacity expansion project. All the three oilfields are located at RJ-ON-90/1 block at Barmer in Rajasthan.

Bhagyam and Aishwariya oil field development project consists of wellpad facilities, associated civil, piping and electrical and instrumentation work, in field pipelines for production fluid, power fluid and injection water, 33 kV over head line and fibre optic cable and in-field roads.

MPT capacity expansion project envisages installation of process train of 75,000 bpd of oil processing consisting of slug clutcher, production fluid heater, production separator, settling tank and dehydrator, tie in and seamless integration with current MPT facilities, oil storage and metering facilities, expansion of integrated control system, associated piping, mechanical, electrical and civil work.

The last date of submission of EoIs is 26 July 2009.

Also See:

Cairn plans investment in two fields of Rajasthan (28-May-2009)

Related Links:
Tender

← All latest storiesBack to top →