Cairn Energy invites EoI for modification of onshore facilities at SuvaliIllustrative image – not actual.

The UK-based Cairn Energy has invited bidders for the modification of its onshore facilities in Suvali on the Gujarat coast. The project – a joint venture of CEIL, ONGC and Tata Petrodyne -- is seeking to upgrade the existing facility by installing additional facilities and increasing its capacity from the current 150 to 165 mmscfd and also cater to reduction in hydrocarbon dew point of the current sales gas specification.

 

The scope of the work would involve detailed engineering procurement, fabrication and installation of additional pipeline, new hydrocarbon dew point facility using suitable refrigeration packages and tie-in process, electrical, instrumentation works and the existing system. The work is required to be completed by the end of July 2004.

 

Interested parties should send their Expressions of Interest within 10 days of issue of this advertisement. Bidders can send their applications to [email protected]