Illustrative image – not actual.
A cable stayed bridge built by Larsen & Toubro (L&T) over Durgam Cheruvu lake in Hyderabad, Telangana, was inaugurated by Minister of Municipal Administration & Urban Development Industries K T Rama Rao.
The inaugural ceremony was performed on 25 September 2020. The cost of the project is Rs 184 crore.
Constructed under Telangana’s Strategic Road Development Programme, the bridge will ease traffic flow towards HITEC City, reducing commute time from Jubilee Hills to Madhapur from 30 minutes to a mere 10 minutes and the distance from Mind Space to Jubilee Hills by two km.
A unique aspect of this bridge is that it has the world’s longest precast segmental span of 233.85 mtr in concrete for a cable stayed bridge.
It was constructed using a total of 428 tonne of high-tensile strand, 26,600 cu mtr of concrete, 4,800 tonne of steel and 287 tonne of stay cables.
The cable stayed bridge portion is 435 mtr long, including approaches at both ends, 25.8 mtr wide with a total of 52 stay cables. The approach viaduct and solid ramps are 309.8 mtr long with 1.8 mtr wide footpaths on both sides.
While the cables were procured from Germany, everything else is sourced from India.
