Cable Corporation of India installs cables for F1 race trackIllustrative image – not actual.
Cable Corporation of India (CCI) has finished installation of the 230 kV cable system at Buddh International Circuit in Greater Noida, Uttar Pradesh.

CCI had bagged the cable supply order from Jaypee Sports International (JPSI). The order envisaged a supply of approximately 8 km of 1x800 sq mm of aluminium conductor XLPE insulated cable, straight thru joints, outdoor termination kits along with allied material. The 5.14km track has been built by JPSI. The first event of India's Grand Prix is scheduled to be held on 30 October as the 17th race of 2011 Formula One Season.

Related Links:
Project profile

← All latest storiesBack to top →