Illustrative image – not actual.
The Cabinet Committee on Economic Affairs (CCEA) chaired by Prime Minister Narendra Modi has approved proposals of the Department of Promotion of Industry & Internal Trade (DPIIT) for construction of various trunk infrastructure components.
This includes Krishnapatnam industrial area in Andhra Pradesh with an estimated cost of the project Rs 2,139.44 crore; Tumakuru industrial area in Karnataka with an estimated cost of Rs 1,701.81 crore; and multi-modal logistics hub (MMLH) and multi-modal transport hub (MMTH) at Greater Noida in Uttar Pradesh with an estimated cost of Rs 3,883.80 crore.
The projects envisioned on the backbone of major transportation corridors like the Eastern & Western Dedicated Freight Corridors, expressways and national highways, proximity to ports, airports, etc, the objective of Industrial Corridor Programme is the creation of greenfield industrial cities with sustainable, plug n play, ICT enabled utilities to facilitate the manufacturing investments into the country by providing quality, reliable, sustainable and resilient infrastructure to industries.
The developed land parcels in these cities will be ready for immediate allotment for investments into manufacturing. These projects have been planned on the backbone of multi-modal connectivity infrastructure.
Krishnapatnam and Tumakuru industrial areas under Chennai-Bengaluru Industrial Corridor (CBIC) have been approved to kick start the development in Chennai-Bengaluru Industrial Corridor Project.
These greenfield industrial cities will be self-sustained with world-class infrastructure, road and rail connectivity for freight movement to and from ports and logistics hubs along with reliable power and quality social infrastructure.
The projects will create employment opportunities through industrialisation. For Krishnapatnam node, estimated employment projection on completion of Phase-I of the development is likely to be around 98,000 persons of which about 58,000 persons are likely to be employed at the site.
For Tumakuru node, employment of around 88,500 persons is estimated, out of which 17,700 will be from service industries such as retail, offices and other commercial opportunities in the initial development phase.
The MMLH & MMTH projects at Greater Noida are in close proximity to Eastern Peripheral Expressway, NH-91, Noida- Greater Noida Expressway, Yamuna Expressway, Eastern& Western Dedicated Freight Corridors.
The logistics hub project will be developed as a world-class facility that will provide efficient storage/transitioning of goods to/from the Dedicated Freight Corridors (DFC) and offer a one-stop destination to freight companies and customers. The facility will not only provide standard container handling activities but also provide various value-added services to reduce logistics cost with improved efficiency of operations.
The MMTH project located near the already existing railway station of Boraki will act as a transport hub with provisioning of rail, road and MRTS accessibility for passengers in a seamless manner.
It will have space for inter-state bus terminal (ISBT), local bus terminal (LBT), Metro, commercial, retail and hotel space and green open spaces.
The project will provide passenger movement facilities for the growing population of catchment zone catering to upcoming developments in Uttar Pradesh sub-region of NCR and thus, decongest Delhi.
The employment generation estimated is about 1,00,000 people by 2040 for both these projects.
