Illustrative image – not actual.
The Cabinet Committee on Economic Affairs (CCEA) chaired by Prime Minister Narendra Modi, has given approval to the proposal of the Department of Fertilisers for extension of applicability of New Investment Policy (NIP)-2012 for three units of Hindustan Urvarak & Rasayan (HURL) -- Gorakhpur, Sindri and Barauni.
HURL, incorporated on 15 June 2016 is a Joint Venture Company by Coal India (CIL), NTPC and Indian Oil Corporation (IOCL).
HURL is reviving the erstwhile Gorakhpur and Sindri Units of FCIL and Barauni Unit of GFCL by setting up new gas-based urea plants with the installed capacity of 12.7 lakh tpa each. The cost of three HURL urea projects is Rs 25,120 crore. GAIL is supplying natural gas to these three units of HURL.
The state-of-the-art based HURL plants are a part of the initiative taken by the Centre to revive the closed urea units of SCIL/HFCL in order to achieve self-sufficiency in urea sector. The commissioning of the three units will add 38.1 lakh tpa indigenous urea production in the country.
All three HURL units have various unique features like state-of-the-art blast proof control room equipped with distributed control system (DCS), emergency shutdown system (ESD) and environment monitoring systems.
There is no offsite waste water disposal in these plants. HURL-Gorakhpur unit has India’s first air operated bulled proof rubber dam of 65 mtr length and two mtr height.
