Illustrative image – not actual.
The Cabinet Committee on Economic Affairs (CCEA), chaired by the Prime Minister Narendra Modi, has granted approval for improvement and widening to two-lane road in Tripura. The project involves investment of Rs 2,486.78 crore which includes a loan component of Rs 1,511.70 crore (JPY 23,129 million).
The widening of this road, with paved shoulder of road from km 101.300 (Khowai) to km 236.213 (Harina) of NH-208, covers a total length of 134.913 kms in the state. The project is envisaged to facilitate better road connectivity between various parts of the state and to provide alternative access to Assam and Meghalaya from Tripura apart from existing NH-8.
The loan assistant will be from Japan International Cooperation Agency (JICA) under Official Development Assistance (ODA) scheme. It aims to provide smooth and motorable roads after considering socio economic needs of the region. Development of the project stretch of NH-208 would improve interstate connectivity and also reduce the transit time and provide safer connectivity for the travellers.
The project stretch also passes very close to Bangladesh border and it would improve connectivity to Bangladesh through Kailashahar, Kamalpur and Khowai Border Check Post. The land border trade would also potentially grow with the improvement in road network in the region through development of the project road.
The construction period for the project stretches will be two years, including the maintenance of these NH stretches for five years (in the case of flexible pavement)/ 10 years (in the case of rigid pavement) after completion of construction.
