Illustrative image – not actual.The Byculla cable-stayed road over bridge (ROB) in Mumbai has reached 80 percent completion, with the bridge expected to open before the monsoon season, as per Maharashtra Rail Infrastructure Development Corporation (MahaRail).
The new bridge, being built next to the existing ROB, aims to maintain traffic flow on the Eastern Express Highway during construction. Once operational, the old bridge will undergo strengthening work. The Rs 287 crore project involves a 916-mrs.-long bridge with a height of 9.70 mtrs. and a pylon height of 50 mtrs. The upgraded bridge will provide four traffic lanes, replacing the current two-lane bridge. Additionally, it will feature a three-tier utility duct system, LED lighting with remote control, and a designated selfie point for visitors.
MahaRail used double eye-cell (DEC) technology to facilitate construction. The bridge will integrate with the existing Y-shaped corridor to ensure smooth traffic movement.
