BSES to set up coal washery in GujaratIllustrative image – not actual.

BSES is likely to set up a coal washery in Gujarat, primarily to supply washed coal to the Gujarat Electricity Board (GEB).

 

BSES has obtained an order from the GEB for washing 1.5 lakh tonnes of coal at its washery at Korba in Madhya Pradesh. If this order is executed satisfactorily, GEB is likely to ask BSES to set up a washery in Gujarat. Otherwise, GEB may go through the competitive bidding route for setting up the washery.

 

BSES has set up a company, ST-BSES Coal Washeries, in joint venture with Spectrum Technologies. The JV company operates a coal washery in Madhya Pradesh and supplies washed coal to the 500 MW Dahanu power station in Maharashtra, operated by BSES. The company plans to expand its capacity by setting up coal washeries in other parts of the country as well. The washed coal would be mainly supplied to state electricity boards. The proposed entry into Gujarat is part of the expansion plans.

← All latest storiesBack to top →