BP-operated PSVN Project commences Angola productionIllustrative image – not actual.

BP Exploration Angola, as the operator, and the partners of Block 31 has commenced the production from the PSVM development area in Block 31, offshore Angola.

PSVM produces through a converted hull, floating, production, storage and offloading vessel (FPSO) with 1.6 million barrels of storage capacity and the first FPSO in Angola ultra-deep water. A total of 40 production, gas and water injection wells will be connected to the FPSO through 15 subsea manifolds and associated subsea equipment.

The PSVM development project was developed with more than 20 per cent local content in the manufacture and assembly of key components in Soyo, Dande, Luanda, Porto Amboim and Lobito construction yards.

Source: YourIndustryNews
 

← All latest storiesBack to top →