Illustrative image – not actual.The plan is to integrate the proposed metro line and elevated corridor alongside the existing bus stops and the railway line that passes through the junction. In 2018, the BMRCL changed the alignment of the proposed metro line to airport (Phase-2B), shifting the line to Hebbal following complications in the route proposed from Nagavara.
The proposed additional loop to Hebbal Flyover to facilitate vehicle movement from Esteem Mall towards the city has been merged with the six-lane elevated corridor. The planned suburban rail station will also be connected at the Hebbal junction.
