Illustrative image – not actual.
The Bangalore Metro Rail Transport Corporation (BMRCL) has invited the Commissioner of Railway Safety to inspect the underground stretch of the East-West line that runs from Baiyappanahalli to Mysuru Road.
BMRCL has conducted all the tests on the East-West corridor and is ready for a safety inspection.
Once the line is thrown open, people can travel all the way from Mysuru Road to Baiyappanahalli in just one train, which will go underground at the Majestic area and emerge on top at the Cubbon Park station / Minsk Square and then continue on the elevated stretch.
