Illustrative image – not actual.
The proposal of Bangalore Metro Rail Corporation Ltd (BMRCL) to develop two lakes -- Kengeri and Veerasandra -- in Bengaluru has reached its final stage.
This will be a major boost to at least two of the city’s neglected water bodies, which have now reduced from 1,600 to only 210 lakes over the years.
Spread over 20 acre, Kengeri and Veerasandra lakes are almost dry and covered by hyacinth. The major challenge for the BMRCL will be to keep them sewage-free.
Kengeri lake, located near Mailasandra station on Mysuru Road, will be developed in four months. The Detailed Project Report is almost ready and the work will be taken up once the Lake Development Authority gives its approval.
The rejuvenation of Veerasandra lake, near the proposed Hebbagodi metro station in Phase-II, will take at least one year.
BMRCL planned to make the two water bodies model lakes. The concept includes setting up fountains, walkways and boating. While there is a waste water flow into Kengeri lake, Veerasandra lake is surrounded by industries. The idea is to develop these lakes into public space.
