BMRCL completes green line trial runIllustrative image – not actual.

Bangalore Metro Rail Corporation (BMRCL) on 28 June 2012 successfully completed test run for first green line in Bangalore.

The test run was put on the 1.2-km test track at the Peenya Depot. The set of green trains are expected to cater to the Green Line on the North South Corridor of Namma Metro Phase I. Of the 29 train sets required for the North South corridor, three have been supplied to the Peenya depot. 
 
Related Links:
Project profile
← All latest storiesBack to top →