Illustrative image – not actual.
The Brihanmumbai Municipal Corporation (BMC) has decided to construct a cable-stayed flyover which will cross over the Metro and WUR to connect the east and west.
The civic body’s bridge department is presently working on the general arrangement drawings (GAD) of the proposed flyover.
A lane of the Sudhir Phadke flyover will be extended over the highway and will connect the highway near the National Park junction. The road will cross both, the Andheri-Dahisar Metro line and the WUR and will go down along the highway near the Sanjay Gandhi National Park junction. The flyover will reduce the distance by at least 1.5 km.
Once GAD is completed, tenders will be floated to award the project. After the award of the work order, the project will be completed in 24 months.
