Illustrative image – not actual.Brihanmumbai Municipal Corporation and the Mumbai Metropolitan Region Development Authority (MMRDA) will join hands to undertake the re-development work of 12 bridges.
BMC has been given development work of the bridges situated on the Mithi river system upstream of the Kurla-Kalina Road. The six bridges under this stretch are: Kurla-Kalina Bridge, Krantinagar Bridge, Ashok Nagar Bridge, Bamandayapada Bridge, Pipeline Service Road Bridge and the Filterpada Bridge. Tenders for these bridges have been floated and consultants are soon to be appointed. MMRDA will fund the project which is estimated at Rs.380 crore, while BMC will carry out the work.
MMRDA has also asked the civic body to take up the work on five bridges on the Mithi River and one on the Vakola nullah. The six bridges handed over to the BMC by MMRDA includes Mahim Causeway Bridge, Tansa Pipeline Bridge, Vaitarna Pipeline Bridge, Dharavi Bridge, and CST Road Bridge. These bridges are all over the Mithi River. Apart from this, the list also includes Pipeline Bridge over Vakola nullah.
Consultants have been appointed for the design and drawing of these bridges and work is expected to start in December 2008. The FFC has also recommended widening of the Nehru Nagar nullah system which leads to the Mahul creek and the Deonar nullah system along with bridges on Ghatkopar-Mankhurd link road. Tendering procedure for these two stretches is expected to start soon.
