Illustrative image – not actual.The Brihanmumbai Municipal Corporation (BMC) and the Mumbai Metropolitan Regional Development Authority (MMRDA) will work in co-ordination to construct a 4.5 km flyover on Jogeshwari-Vikhroli Link Road (JVLR).
The two tier flyover project will run from Samartha nagar in Lokhandwala to Mahakali Caves. The Metro-VI line (Vikhroli to Samartha nagar in Lokhandwala) will run from above this flyover.
Work on construction of the Metro-VI rail has been awarded to Delhi Metro Rail Corporation (DMRC).
The flyover is independent of the Metro-VI rail but it will be constructed on common pillars.
BMC will construct the flyover from Western Express Highway to SV road in Jogeshwari and it will be extended from both ends. The extension from both ends will be constructed by MMRDA.
Out of the 4.5 km length of flyover, 2.8 km will be constructed by MMRDA from Western Express Highway to Mahakali Caves and from SV road in Jogeshwari to Samartha nagar in Lokhandwala. This will be a four lane flyover.
The deadline to construct the flyover is 2020 and that for the Metro-VI line is 2021.
