Illustrative image – not actual.
The Brihanmumbai Municipal Corporation (BMC) has awarded the contract to Larsen and Toubro (L&T) as the agency for the construction works of the Dahisar-Bhayander Link Road (DBLR), which will be the final phase of the civic body’s coastal road project. The project is set to begin immediately after the monsoon season.
As per the contract, L&T will also be responsible for environmental clearances for the project. Further, the company is the executing agency for the first phase of the Mumbai Coastal Road Project (MCRP), which is likely to be opened by the end of this year, connecting Marine Drive with the Bandra Worli Sea Link.
The DBLR project, costing Rs 3,186 crore, will be a 5.6-km-long stretch, of which 1.5 km will be under the jurisdiction of BMC, while 4.1 km will be under the jurisdiction of Mira-Bhayander Municipal Corporation (MBMC). It will connect Dahisar with the satellite town of Bhayander through a series of arterial roads and tunnels.
The elevated bridge, which will be 45 mtrs. wide and built on stilts, will have 4×4 lanes to allow smooth traffic flow, and the emergency lanes for passage of vehicles, including ambulances and fire-brigade engines, will be constructed on both sides. In addition, BMC is also exploring options to create multi-level car parking and a transport bay beneath the arterial road.
