Illustrative image – not actual.The scope of work includes design, engineering, supply, installation and commissioning of air-conditioning, tunnel ventilation and environmental control system for nine underground stations and associated tunnels on Line-3 corridor of the Mumbai Metro between Mumbai Central and Bandra.
MMRCL is a joint venture (JV) between the government of India and the government of Maharashtra. Also known as the Colaba-Bandra-SEEPZ line, partially funded by the Japan International Cooperation Agency (JICA), it is the longest continuous underground Metro stretch in the country.
This turnkey project will require approximately 8,200 TR of water-cooled screw and magnetic bearing chillers, chilled water and condenser water pumps, air handling units, fan coil units, piping, ducting, insulation, tunnel ventilation fans, dampers, compressed air system, associated electrical work and a SCADA system, among others.
